|
|
GREENER: An environnemental improvement
| Consumption/year |
Chemical machining |
Mechanical machining |
| H2O |
225 000 m3 |
0 |
| CO2 |
6200 t |
0 |
| Solvents |
6200 t |
0 |
| OIW (1) |
300 t |
0 |
| SIW ( 2) |
9000 t |
0 |
| VOC (3) |
850 t |
0 |
| Elec.(Gwh/year) |
7 |
3 |
| Sludges or Cuttings |
Sludges impossible to recycle |
700 t |
(1) OIW : Ordinary Industrial Waste
(2) SIW : Special Industrial Waste
(3) VOC : Volatile Organic Compound
|
FASTER : Technical performances in terms of quality, machining time and flexibility
| |
Machining Time |
| Chemical machining |
10h00 |
| Mechanical Machining |
4h40 |
|
CHEAPER : A determining Return on Investment (ROI).
| Working Cost |
- 50% |
| Cycle Time |
- 50% |
| Orofits from cuttings and chips resale |
900€ / tons |
Total Profit Per Year (7000 panels) |
5 M€ |
|
|
|
|